BACKGROUND

On August 15, 2017 the City Council approved Resolution No. 2017-044 declaring an emergency condition and approving the execution of a contract for water treatment facilities.  Section four of Resolution No. 2017-044 calls for a report describing the status of emergency circumstances to be provided by the City Manager at each City Council meeting until either the installation of the treatment facilities has been completed or the emergency conditions cease to exist.

 

ISSUES/ANALYSIS

The following is a report on the status of the emergency circumstances as outlined in the attached Resolution No. 2017-049:

 

Since the time of the last (September 19, 2017) report on this subject, there have not been any changes to the State-imposed MCL for 123TCP and there have not been any changes to the water quality produced by affected city wells.

 

Work to install the granular activated carbon water treatment equipment is processing in accordance with the approved schedule and equipment submittals are under review.

 

Benson Site

·         Foundation design and structural calculations in-process pending results of soil testing

 

Eastside Site

·         Foundation design and structural calculations have been submitted and are currently under review by City staff.

 

On September 19, 2017, City staff and a representative from RC Foster met with the State Water Resources Control Board, Division of Drinking Water (DDW) to review the requirements associated with the domestic water supply permit amendment.  This permit amendment is necessary to incorporate these new treatment facilities into the City’s water supply system. Throughout the construction, and during the testing of these new facilities, City staff will coordinate with RC foster and DDW to complete and submit the permit amendment application for DDW review and approval.

 

 

Meeting History

Oct 3, 2017 7:00 PM Video City Council Regular Meeting
draft Draft
RESULT:APPROVED [UNANIMOUS]
MOVER:Earl C. Elrod, Council Member
SECONDER:Gary George, Council Member
AYES:Gary George, Paul Rodriguez, Eunice M. Ulloa, Tom Haughey, Earl C. Elrod